![]() ![]() Thousands of people will flock to Rocky Mountain National Park in Colorado in the coming weeks for the annual fall tradition of Elk Fest. Check out our previous posts and today’s feature on Trail Ridge Road in Rocky Mountain National Park. This series showcases the roads and scenic drives you don’t want to miss on your next #parkchasing visit. Each year, thousands of Americans embark on road trips and driving adventures to national parks. For a recorded status line on Trail Ridge Road please call (970) 586-1222.Today Park Chasers is sharing another installment in our series on epic drives within the National Park Service. This year, crews ran into average snowpack.įor more information about Rocky Mountain National Park visit or call the park's Information Office at (970) 586-1206. Spring storms often impact plowing activities. The visitor center is the highest in the National Park Service, sitting at 11,796 feet above sea level. Crews from the west side of the park and crews from the east side of the park move along the road and eventually meet at the Alpine Visitor Center. National Park Service plow operators began clearing the snow in the middle of April. Trail Ridge Road officially closed for the season last year on October 24. Trail Ridge Road is the highest continuous paved road in the United States, climbs to 12,183 feet and connects the towns of Estes Park and Grand Lake. ![]() The earliest the road has opened was on the latest June 26, 1943. Trail Ridge Road historically opens on Memorial Day weekend last year the road opened on May 27. The reservation system will apply to all areas of the park. Permits issued using the reservation system will allow park visitors to enter the park within two-hour windows of availability. The second permit is for the rest of Rocky Mountain National Park, excluding the Bear Lake Road corridor, and includes Trail Ridge Road. One permit is for the Bear Lake Road Corridor, which includes the entire corridor and access to the rest of the park. In 2023, there are two types of reservations available. The park has piloted various visitor use management strategies since 2016, including first-come, first-served as well as different parkwide Timed Entry Permit Reservation system pilots since 2020. Visitor crowding and congestion have led to increased negative impacts to visitor and staff safety, resource protection, visitor experience and operational capacity. Rocky Mountain National Park is one of the busiest national parks in the country, with over 4.3 million visitors in 2022. The timed entry system for Rocky Mountain National Park will begin on Friday.Īdditional Information from Rocky Mountain National Park: However, RMNP officials said that because of melting snow on the road and the potential for freezing temperatures, travelers should be prepared for icy conditions.īecause weather conditions may change rapidly at higher elevations, visitors should be prepared to adjust travel plans accordingly and call the Trail Ridge Road recorded status phone line at (970) 586-1222 which is updated by park staff. ![]() Trail Ridge Road in Rocky Mountain National Park will open on Friday, May 26 at 6 a.m. Crews busy plowing Trail Ridge Road in Rocky Mountain National Park 02:40 ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |